Funded by Washington Clean Fuels Standard

Applications Open Dec. 1, 2026–March 31, 2027

2027 Important Deadline

FEB. 22, 2027

Electric Pathways New Service Questionnaire (NSQ) deadline

Required if your project includes EV charging equipment or electrical work.

Do not wait until March 31. The PUD needs time to review your electrical needs and provide a response that you must include with your grant application.

MARCH 31, 2027

Electric Pathways grant application deadline

Completed grant applications must be submitted by this date.

Ready to apply?

Review the eligibility and application information below to make sure you have everything you need. When you’re ready, submit your Electric Pathways grant application by March 31, 2027.

Apply for Electric Pathways Funding >

Have questions? Contact us at electricpathways@snopud.com

Is my project eligible?

Who can apply?

You can apply if you are:

  • A Snohomish County PUD non-residential customer, or
  • Formally partnering with a PUD non-residential customer.

For partnership applications, the partnering organization must have a direct role in implementing the project. Project roles must be clearly defined, and both parties must sign the application.

Your project must:

  • Be located within PUD service territory.
  • Support electric transportation or mobility.
  • Be completed within 18 months of the initial payment.
  • Meet applicable program and equipment requirements.
  • Use UL-certified charging equipment listed on the EPRI Qualified Product List, when applicable.
  • Align with the program’s evaluation criteria.

What are Eligible Populations and Communities?

Eligible Communities and Populations is a multi-prong definition. Eligible communities and populations can be considered any of the following:

  1. “Low-income” means household incomes that do not exceed the higher of eighty percent of area median income or two hundred percent of federal poverty level, adjusted for household size (WAC 194-40-030).
  2. “Vulnerable populations” means communities identified by the Clean Energy Transformation Act (CETA) as experiencing a disproportionate cumulative risk from environmental burdens due to: (a) Adverse socioeconomic factors, including unemployment, high housing and transportation costs relative to income, access to food and health care, and linguistic isolation; and (b) Sensitivity factors, such as low birth weight and higher rates of hospitalization (RCW 19.405.020(40)). Utilities should interpret this to mean highly impacted communities identified in their clean energy implementation plans (CEIPs).
  3. Communities disproportionately impacted that are identified by the Washington Department of Health as having a rank of 9 or 10 on the Environmental Health Disparities (EHD) map.

What can funding be used for?

Electric Pathways funding can support eligible costs for electric transportation and mobility projects. Applicants may request funding for costs such as:

  • Electric vehicles
  • EV charging equipment
  • Engineering, design, permitting, construction and installation for EV charging infrastructure, including eligible signage
  • New or upgraded electrical service
  • Maintenance and operations plans for electric vehicles and charging equipment, when eligible
  • Extended warranties for charging equipment, up to five years
  • Network subscriptions and software licensing for charging equipment, up to five years
  • Project management costs, up to 10% of the total project cost
  • Project study, planning and evaluation when related to the transportation electrification project
  • Education and outreach that raises awareness of electric transportation
  • Supporting equipment, such as solar or battery storage, when it is dedicated to and directly supports the transportation electrification project

Not every expense within these categories is automatically eligible. Requirements, limits and exclusions apply.

Before developing your project budget, review the Electric Pathways for Transportation Eligible Project Cost List for complete requirements and to confirm whether each proposed expense is eligible.

The Eligible Project Cost List also identifies costs that cannot be funded. Review it before preparing your project budget.

Planning to install EV charging equipment?

Charging equipment must meet the program requirements, including UL certification and inclusion on the EPRI Qualified Product List when applicable.

If your project includes EV charging equipment, new electrical infrastructure or electrical work, you will also need to complete the Electric Pathways New Service Questionnaire by Feb. 22, 2027.

Do I need an Electric Pathways New Service Questionnaire (NSQ)?

An Electric Pathways NSQ is required if your project includes new infrastructure, EV charging equipment, or electrical work.

You need an Electric Pathways NSQ if your project includes:

  • Installing EV chargers
  • Adding, moving, or upgrading electrical outlets, including standard 120-volt outlets
  • Commercial electrical work
  • Installing wiring or conduit
  • Adding electrical panel capacity for current or future EV chargers

You do NOT need an Electric Pathways NSQ if:

Your project only requests funding for electric vehicles and does not include charging equipment or electrical work.

Electric Pathways NSQ deadline: Feb. 22, 2027

Work with your project’s electrical installer to submit the Electric Pathways NSQ. Use the Electric Pathways form linked on this page. It is different from the PUD’s standard New Service Questionnaire used for other new-service and development requests.

What happens after I submit the Electric Pathways NSQ?

PUD Engineering will review the information to determine whether new or upgraded energy infrastructure is needed to support your project. If applicable, the response will include estimated infrastructure costs.

The PUD expects to provide a response within two weeks of submission. Keep the PUD Engineering response and upload it where prompted in Question 23 of the Electric Pathways grant application.

How do I apply?

1. Confirm your eligibility

Review the eligibility requirements above and the Eligible Costs Project List to confirm that your organization, project, and proposed expenses qualify.

2. Submit an Electric Pathways NSQ, if required

If your project includes new infrastructure, EV charging equipment, or electrical work, work with your electrical installer and submit the Electric Pathways NSQ by Feb. 22, 2027. Allow time for PUD Engineering to provide the response required with your application.

3. Prepare your application

Gather your project information, cost estimates, and required supporting documentation. Use the Application Checklist to confirm that your application is complete.

4. Submit your application

Submit your completed Electric Pathways Grant Application by March 31, 2027.

How will my application be evaluated?

  • 40% Equitable Benefits.  How the project benefits Eligible Populations and Communities.
  • 35% Feasibility & Timeline. The project’s readiness, implementation plan, and ability to complete the proposed work.
  • 25% Sustainability & Use of Funds. The proposed use of funding and the project’s ability to support lasting transportation electrification benefits.

Use the Evaluation Criteria as you prepare your application to understand the scoring categories and the information needed to demonstrate your project’s strengths.

What happens if my project is selected?

Award notifications are expected no later than June 30, 2027. Grant agreements and initial funding activities are expected in Q3 2027 after agreements are signed.The PUD may make one advance payment for project start-up costs. Alternatively, recipients may request reimbursement for eligible project costs. Projects must be completed within 18 months of the initial payment, and reimbursement invoices and supporting documentation must be submitted for project expenses.

Frequently Asked Questions

What are the PUD’s priorities for Electric Pathways?

The PUD aims to expand electric transportation and mobility in its service area. Priority is given to projects that benefit or are located in Eligible Populations and Communities.

Who can apply?

Any PUD non-residential customer may apply. Other organizations may apply when formally partnered with a PUD non-residential customer. The partner must have a direct role in project implementation, roles must be clearly defined, and both parties must sign the application.

What is an example of a project located in an Eligible Population or Community?

A port authority could request funding for medium- or heavy-duty fleet charging in an area ranked 9 or 10 on the Washington Environmental Health Disparities Map. Although the chargers may not be public, the project may reduce pollution in an Eligible Community.

What is an example of a project directly benefiting an Eligible Population?

An affordable housing site could request funding for EV chargers serving residents, staff, and visitors. Even if the property is not in a designated area of need, the project may qualify because it primarily serves an income-qualified population.

What are examples of projects that could qualify?

Examples include nonprofit EV rideshare programs, electric school buses and charging, community college charging hubs, affordable-housing EV car-share programs, commercial or public fleet charging, municipal fleet vehicles, and community EV education and outreach.

Why is the EPT NSQ due before the grant application?

PUD Engineering must review EPT NSQs to determine whether new energy infrastructure is needed and, when applicable, estimate related costs. The February 22 deadline allows time for the PUD to respond before the March 31 grant application deadline.

What response will I receive after submitting an EPT NSQ?

PUD Engineering will provide a response describing the electrical-service review and, when applicable, estimated infrastructure costs. Upload that response where prompted in Question 23 of the Electric Pathways grant application.

What costs are not eligible?

Examples include indirect costs, vehicle insurance, extended warranties for electric vehicles, ongoing energy or EV charging costs, project management or administrative costs above 10% of total project cost, solar or battery systems not dedicated to the transportation electrification project, donated or volunteer materials or labor, and contingency costs.

Is there a funding limit?

Yes. Applicants may request up to $350,000 in eligible costs. Final award amounts are at the PUD’s discretion.

When will funding be available?

Award notifications are expected no later than June 30, 2027. Any approved advance payments are expected in Q3 2027 after grant agreements are signed.

Is there an application checklist?

Yes. Use the Application Checklist in the resources section below to confirm that your application is complete.

What’s the history of the Electric Pathways for Transportation program?

Washington’s Clean Fuels Program, administered by the Washington Department of Ecology, was created to reduce greenhouse gas emissions and air pollution from transportation fuels. The program uses a market-based system in which cleaner transportation fuels can generate credits, while fuels with higher carbon intensity generate deficits.

Snohomish County PUD enrolled in the Clean Fuels Program in 2023, allowing the PUD to earn clean fuel credits associated with transportation electrification in its service territory. The PUD developed Electric Pathways for Transportation in 2025 as a way to reinvest revenue from the sale of those credits into local transportation electrification projects.

The first Electric Pathways grant funding round opened in November 2025. It drew applications from cities, nonprofits, school districts and businesses for projects ranging from electric vehicles to Level 2 and DC fast-charging infrastructure.  Today, Electric Pathways continues that investment by helping PUD customers bring electric transportation projects to their communities, with an emphasis on expanding access and benefits for communities that need them most.